This Centre is internal commercial readiness workflow. Numbers below are staging / simulated commercial data. Nothing on this surface is a financial promotion, a binding commercial offer, legal advice, regulatory approval, or authorization for external launch. External institutional production remains No-Go in line with the Production Go/No-Go Board and the Launch Readiness Command Centre. Production cutover still requires Microsoft Entra OIDC with Conditional Access, RBAC/ABAC, server-side session issuance, and SIEM-forwarded audit events.
Domains map back to Launch Readiness gates and the 21 evidence packs. Every domain has a named owner and an audit-event tag.
Segment assignment drives access to evidence rooms, distribution modes, and the pricing tier matrix below. None of these segments imply a binding commercial offer.
Sample rows aligned to current Production Go/No-Go and Approval & Sign-Off posture. External institutional rows stay No-Go.
Sample posture aligned to the Counterparty DD Pilot. KYC/KYB itself is partner-routed today; BLACKSWAN holds the workflow, evidence, and audit trail.
Production cutover for external scope requires every artefact below at Approved Internal or Live Production.
Allowed cells map to a specific Stakeholder Room mode. Blocked cells reflect the current Production Go/No-Go and Stakeholder Rooms posture.
| Segment | Board Prep | Regulator Prep | Evidence Rooms | Data-Room Exports | Counterparty DD | Investor Observer | Monitoring Summary | Reg. Escalation Summary |
|---|---|---|---|---|---|---|---|---|
| Founder / Admin | Allowed | Allowed | Allowed | Limited | Allowed | Allowed | Allowed | Allowed |
| Board / Regulator Prep | Allowed | Allowed | Limited | Blocked | Not-in-scope | Limited | Limited | Limited |
| Professional Counterparty | Blocked | Blocked | Limited | Blocked | Blocked | Not-in-scope | Not-in-scope | Not-in-scope |
| Strategic Partner | Not-in-scope | Limited | Limited | Blocked | Limited | Not-in-scope | Limited | Not-in-scope |
| Investor / Observer | Limited | Not-in-scope | Not-in-scope | Blocked | Not-in-scope | Allowed | Limited | Not-in-scope |
| Auditor / Counsel | Limited | Limited | Allowed | Limited | Not-in-scope | Not-in-scope | Limited | Allowed |
| Institutional Client | Blocked | Blocked | Blocked | Blocked | Blocked | Blocked | Blocked | Blocked |
| Sandbox / Pilot | Not-in-scope | Limited | Limited | Blocked | Limited | Not-in-scope | Limited | Not-in-scope |
Commercial availability follows the Launch Readiness Jurisdiction Matrix and the Production Go/No-Go Board. None of these states imply a binding commercial offer.
| Jurisdiction | Internal Production | Board / Regulator Prep | Counsel / Auditor | Counterparty DD | Investor / Observer | Institutional Production | Notes |
|---|---|---|---|---|---|---|---|
| ADGM / FSRA | Available | Pilot | Pilot | Not available | Pilot | Not available | FSRA pre-engagement scheduled; bundle scope agreed. |
| UK FCA | Available | Pilot | Pilot | Not available | Pilot | Not available | Activity perimeter decision red; counsel opinion outstanding. |
| MAS | Available | Pilot | Not-in-scope | Not available | Pilot | Not available | Partner appointment evidence + Notice 626 alignment pending. |
| MiFID / MiFID II | Available | Pilot | Pilot | Not available | Pilot | Not available | EEA cross-border treatment + best-execution evidence not finalised. |
Simulated tiers only. Nothing on this surface is a binding commercial offer. External-facing tiers (Tier 2/Tier 3) are not approved today.
Steps progress only when the prior step is closed on the Release Control & Rollback Centre. External institutional production remains No-Go.
Each row binds to the Stakeholder Rooms revocation flow and the Release Control rollback runbook.
Sample audit lines consistent with current staging posture. Entries are simulated / staging evidence.
This Commercial Readiness & Client Onboarding Centre is internal readiness workflow. All data shown is staging / simulated commercial data. It is explicitly not:
All regulated activity on the platform remains simulated, partner-routed, locked, or production-regulated as defined in the OS Architecture and Completeness Command Centre. Production cutover still requires Microsoft Entra OIDC with Conditional Access, RBAC/ABAC, server-side session issuance, and SIEM-forwarded audit events. Items shown are plausible sample states consistent with the existing Launch Readiness Command Centre, Production Go/No-Go Board, Approval & Sign-Off Workflow, Release Control & Rollback Centre, Production Monitoring & Incident Command Centre, Regulatory Notification & Board Escalation Centre, and Stakeholder Rooms & Evidence Distribution Centre; live values will be sourced from the Pack Registry once cutover is signed off.